Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for travel industry professionals · Thursday, October 17, 2024 · 752,520,153 Articles · 3+ Million Readers

Travel Advisory: Town-Owned Central Pike Bridge in Foster Scheduled to Close for Replacement on September 16

The Town-owned Central Pike Bridge in Foster (locally known as the Swamp Meadow Covered Bridge) is scheduled to close for replacement on Monday, September 16 for approximately four months.

The low volume bridge, carrying approximately 180 vehicles per day, was built in 1953 and carries Central Pike over the Hemlock Brook. Currently posted at 5 tons, the superstructure of the bridge needs to be replaced. The bridge's covered structure does not need replacement.

During the bridge's closure, motorists are advised to follow the signed detour using Route 94, US Route 6, and Paris Onley Hopkins Road.

All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings, and weather.

The Central Pike Bridge Replacement project is made possible by RhodeWorks and the Bipartisan Infrastructure Investment and Jobs Act. RIDOT is committed to bringing Rhode Island's infrastructure into a state of good repair while respecting the environment and striving to improve it. Learn more at www.ridot.net/RhodeWorks.

Powered by EIN Presswire

Distribution channels:

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Submit your press release